Case studies

Commercial Office

Farringdon West, London

Building services delivery for a major commercial workplace development, supporting the creation of flexible office accommodation, tenant-ready workspace and shared amenity areas within a landmark Farringdon scheme.

Location
Farringdon, London
Client
HB Reavis
Main Contractor
HB Reavis
Contract Value
£1.9m
Programme
6 Months

The Challenge

Farringdon West was developed as a modern workplace destination designed to meet the expectations of contemporary occupiers.

The scheme incorporated multiple workspace environments, shared amenity areas, wellness facilities, external terraces and a fully equipped “Ready to Work” space, each requiring a coordinated approach to building services integration.

Delivering these environments required careful planning to ensure consistency across multiple floors while supporting the flexibility expected within a premium commercial development.

The Solution

S-Worx delivered the electrical services package across the development, supporting both Cat A and Cat B workplace environments through a coordinated installation strategy.

The project included tenant-ready workspace, shared amenity areas and external facilities, with building services designed to support flexibility, operational efficiency and occupier comfort.

Integration with the wider smart building infrastructure helped ensure the building could support evolving workplace requirements both at completion and into the future.

The Delivery

Works included the fit out of the Level 1 “Ready to Work” space, Cat A installations across Levels 2 to 7 and services associated with the Level 4 roof terrace garden room.

The delivery incorporated lighting and lighting controls, structured cabling infrastructure, modular wiring systems and integration with the building’s smart technology platform.

Close coordination between project teams ensured the successful delivery of services across multiple floors while maintaining programme objectives and design intent throughout the development.

The Result

The completed development provides flexible, high-quality workspace designed to support a wide range of occupier requirements.

Through coordinated delivery and integration with the wider building infrastructure, S-Worx helped create a workplace environment that combines functionality, flexibility and user experience within one of London’s most dynamic commercial districts.

It starts here

Discuss your project

Discuss your project with our team and see how we can support you.