Plant replacement

Your building keeps working whilst the plant gets replaced. We handle end-of-life boilers, switchgear and generators with minimal downtime, even in the most restrictive environments.

What we deliver

Replaced before it becomes a problem

Ageing plant rarely fails at a convenient moment. We replace it before it picks one for you, with the engineering, the access and the downtime planned during the survey stage, not discovered on site.

Boilers and mechanical

Boilers, air handling units and the heating and cooling systems around them. We handle small jobs and larger ones, phased so the building never loses fresh air or temperature control.

Switchgear and distribution

End-of-life switchgear replaced with the shortest possible shutdown windows. Supplies are maintained or temporarily diverted whilst we work, and every outage is planned and agreed.

Generators and standby power

Standby power only matters on the day it's needed. Our team replace generators and the systems around them, commissioned and tested so they're ready for that day.

norwich-1

Complex environments

We can deliver anywhere

Rooftops, basements, listed buildings and live sites all add constraints, so we engineer around them. Our team have done this before, and you can be confident that we'll be able to conduct our plant replacement without disruption or unnecessary delays.

Why us

Why we're chosen

Plant replacement is where engineering and logistics dovetail. We've got the expertise in-house to deliver both seamlessly.

Director-led, start to finish

Our directors are involved from the first conversation. On plant replacement, that means the survey, the method and the shutdown plan all get senior eyes before anything is priced.

Downtime managed

We keep essential services running on a temporary plant whilst the permanent kit is changed. That means downtime is minimised and planned for when it's absolutely required.

Access engineered

Crane lifts, rooftop platforms, restricted plant rooms and buildings that have to stay open. We've dealt with them all. The access plan gets as much engineering as the plant itself.

Case studies

Our work

We've replaced live plant in organisations and spaces of all shapes and sizes. Explore our work below.

IMG 8332 800x600
Commercial Office

Capital UK Ltd, The Broadway

Creating a high-quality headquarters environment through the coordinated adaptation and upgrade of mechanical services across a new Cat B workplace.

View project
Gherkin 5 800x600
Commercial Office

BMS Group, The Gherkin

Delivering a coordinated four-floor MEP fit-out within The Gherkin, creating a contemporary workplace and client environment around existing building infrastructure.

View project
Gracechurch 1 800x600
Commercial Office

77 Gracechurch Street, London

Transforming an existing office floor into a modern workplace environment designed to support collaboration, flexibility and day-to-day user experience.

View project

It starts here

Discuss your project

Discuss your project with our team and see how we can support you.