Plant replacement
Your building keeps working whilst the plant gets replaced. We handle end-of-life boilers, switchgear and generators with minimal downtime, even in the most restrictive environments.
What we deliver
Replaced before it becomes a problem
Ageing plant rarely fails at a convenient moment. We replace it before it picks one for you, with the engineering, the access and the downtime planned during the survey stage, not discovered on site.
Boilers and mechanical
Boilers, air handling units and the heating and cooling systems around them. We handle small jobs and larger ones, phased so the building never loses fresh air or temperature control.
Switchgear and distribution
End-of-life switchgear replaced with the shortest possible shutdown windows. Supplies are maintained or temporarily diverted whilst we work, and every outage is planned and agreed.
Generators and standby power
Standby power only matters on the day it's needed. Our team replace generators and the systems around them, commissioned and tested so they're ready for that day.
Complex environments
We can deliver anywhere
Rooftops, basements, listed buildings and live sites all add constraints, so we engineer around them. Our team have done this before, and you can be confident that we'll be able to conduct our plant replacement without disruption or unnecessary delays.
Why us
Why we're chosen
Plant replacement is where engineering and logistics dovetail. We've got the expertise in-house to deliver both seamlessly.
Director-led, start to finish
Our directors are involved from the first conversation. On plant replacement, that means the survey, the method and the shutdown plan all get senior eyes before anything is priced.
Downtime managed
We keep essential services running on a temporary plant whilst the permanent kit is changed. That means downtime is minimised and planned for when it's absolutely required.
Access engineered
Crane lifts, rooftop platforms, restricted plant rooms and buildings that have to stay open. We've dealt with them all. The access plan gets as much engineering as the plant itself.
Case studies
Our work
We've replaced live plant in organisations and spaces of all shapes and sizes. Explore our work below.
Norwich Crown Court AHU Replacement
Phased replacement of eight rooftop air handling units at Norwich Crown Court, keeping ventilation and courtrooms fully operational throughout.
View project
Capital UK Ltd, The Broadway
Creating a high-quality headquarters environment through the coordinated adaptation and upgrade of mechanical services across a new Cat B workplace.
View project
BMS Group, The Gherkin
Delivering a coordinated four-floor MEP fit-out within The Gherkin, creating a contemporary workplace and client environment around existing building infrastructure.
View project
77 Gracechurch Street, London
Transforming an existing office floor into a modern workplace environment designed to support collaboration, flexibility and day-to-day user experience.
View project
IGI 20 Fenchurch Street, London
Transforming workspace within the Walkie Talkie building through a carefully coordinated Cat B refurbishment focused on modern ways of working.
View projectIt starts here